§ 17.34.060. Plan preparation after tentative map approval.  


Latest version.
  • After approval of the tentative map for which a final map is required, but before starting any construction work, the subdivider or his authorized representative shall submit two complete sets of improvement plans to the director of planning for his review and approval, not later than six weeks prior to the expiration date of the tentative map. Such plans shall be prepared by a civil engineer who is licensed to practice civil engineering in the state. All conditions of the grading permit, tentative map, planned development, use permit or other permits which are applicable to construction, shall be shown on the improvement plans. The director of planning shall, within twenty-five days after receipt of the plans, send a checklist or a marked-up print to the subdivider or his authorized representative, upon which will be noted recommended or required revisions. After all necessary changes are made, the original tracings shall be submitted to the director of planning for signature to indicate approval.

    (Ord. 854 § 2 (part), 1987: prior code § 11667.1)

(Ord. No. 1379, § 118, 1-29-2013)