§ 17.34.060. Plan preparation after tentative map approval.
Latest version.
After approval of the tentative map for which a final map is required, but before
starting any construction work, the subdivider or his authorized representative shall
submit two complete sets of improvement plans to the director of planning for his
review and approval, not later than six weeks prior to the expiration date of the
tentative map. Such plans shall be prepared by a civil engineer who is licensed to
practice civil engineering in the state. All conditions of the grading permit, tentative
map, planned development, use permit or other permits which are applicable to construction,
shall be shown on the improvement plans. The director of planning shall, within twenty-five
days after receipt of the plans, send a checklist or a marked-up print to the subdivider
or his authorized representative, upon which will be noted recommended or required
revisions. After all necessary changes are made, the original tracings shall be submitted
to the director of planning for signature to indicate approval.
(Ord. 854 § 2 (part), 1987: prior code § 11667.1)
(Ord. No. 1379, § 118, 1-29-2013)
var val = document.getElementById('citecontent').innerHTML;
art.dialog.defaults.title = window.location.href;
art.dialog.data('cite', val);
art.dialog.data('homeDemoPath', '/Scripts/plus/artDialog/');
art.dialog.open('/Scripts/plus/artDialog/citeiframe.html');