§ 18.44.150. Utilities.  


Latest version.
  • Drainage development standards in the GI district are as follows:

    A.

    Connection to a public sewer, as that term is defined in Section 13.16.290, shall be required prior to issuance of a certificate of occupancy or the commencement of a use not requiring a certificate of occupancy, except that if the director or director's designee determines that serving a lot is not feasible due to topography or location of the lot, and certifies that the proposed use will not produce a sewage flow of more than fifteen hundred gallons per day and that the proposed use will not be detrimental to the public health and/or safety, a private or individual sewage disposal system shall be permitted until such time as public sewer connection becomes feasible.

    B.

    Where a lot within the GI district is also located within the jurisdiction of a water service agency which has adopted a water facilities master plan, no occupancy permit shall be issued, parcel/final map recorded, or use commenced pursuant to a use permit, whichever occurs first, until the property owner has furnished the county with proof of compliance from the service agency that the requirements of such master plan have been met.

    (Ord. 896 § 1 (part), 1988: prior code § 12279.14)

(Ord. No. 1379, § 154, 1-29-2013)