§ 17.40.020. Required inspections designated—Notice to county.
The director of planning shall make such inspections as deemed necessary and shall be notified twenty-four hours in advance of any required inspection. Minimum inspection requirements follow:
A.
The inspection of clearing and grubbing work before grading operations are started in any cut or fill area;
B.
The inspection and compaction testing of subgrade before the placing of subbase, base and surfacing;
C.
The inspection of storm drain and sewer pipe installation and backfill, including compaction testing;
D.
The inspection and compaction testing of subbase and base prior to paving;
E.
The inspection of all penetration treatment, seal coat, and paving while the work is in progress;
F.
The inspection of concrete forms;
G.
The inspection of concrete while being placed;
H.
Final inspection.
(Ord. 854 § 2 (part), 1987: prior code § 11676.2)
(Ord. No. 1379, § 128, 1-29-2013)