§ 17.08.050. Tentative map—Content when final map required.  


Latest version.
  • A tentative map for which a final map is required shall be prepared by a registered civil engineer or to the extent permitted by law a licensed land surveyor and in addition to the informational requirements of Sections 17.08.030 and 17.08.040 shall include the following:

    A.

    Site Grading Requirements.

    1.

    Whenever any area of the proposed subdivision has a gradient of ten percent or more, as measured between natural contours, the following information shall be shown on, or accompany, the tentative map:

    a.

    The proposed cuts and fills in the subdivision,

    b.

    The elevations of all individual building pads in the subdivision,

    c.

    The elevations at the perimeter of the subdivision,

    d.

    The relationship to adjoining land and development;

    B.

    Ownership information regarding property which is adjacent or contiguous to the land to be subdivided;

    C.

    Whether multiple final maps will be filed and the number of such multiple final maps to be filed, if known.

(Ord. 854 § 2 (part), 1987: prior code § 11610)